Perryopolis Heritage Mural
"There's no reason not to consider the world as one gigantic painting" - Robert Rauschenberg
Monday, June 27, 2011
Finished!
Logos sketched in pencil then painted and colored (thanks to a Sharpie donation!)
click to enlarge image, then use zoom for close ups
Now the bricks and shield need to be sealed with clear coat for protection and after a little landscaping, I think it will look fine!
Sunday, June 26, 2011
Logos
I really wasn't happy with the layout of the logos after 2 hours, they looked like this...
so after some Photoshopping, this is the way I want them to look...
So I'll get that done tomorrow, and hopefully now that I know how it should look, it won't take too long. Also I need to remember to bring a yellow paint that will mix with the red to make a good orange, the yellow I was using kept turning the PNC logo light red. Also, I discovered that makeup brushes at Dollar General are very good for detail painting and super cheap.
so after some Photoshopping, this is the way I want them to look...
So I'll get that done tomorrow, and hopefully now that I know how it should look, it won't take too long. Also I need to remember to bring a yellow paint that will mix with the red to make a good orange, the yellow I was using kept turning the PNC logo light red. Also, I discovered that makeup brushes at Dollar General are very good for detail painting and super cheap.
Sunday, June 5, 2011
Completed Names and In Progress Logos
Saturday, November 27, 2010
Weather Problems
If anyone has recently driven past the mural and noticed white streaks on the lower right half it is because of the sealant. It was a clear coat applied in late October when the temperature was warm enough for application, but apparently the sealant didn't adhere correctly probably because it got cold soon after being applied. This doesn't mean the actual painting has been affected, just the top clear coat, and luckily it's only the bottom half as the top half was sealed in late summer before the scissor lift was returned.
Hopefully it can be fixed in the spring, and if worst comes to worst, I'll just have to repaint the lower half of the coke oven section. Though I think there is a way to remove the sealant that didn't adhere properly without any damage to the painting.
Hopefully it can be fixed in the spring, and if worst comes to worst, I'll just have to repaint the lower half of the coke oven section. Though I think there is a way to remove the sealant that didn't adhere properly without any damage to the painting.
Sunday, October 3, 2010
Dedicated... but not yet done.
The list of names I have so far includes:
Luce
Brown
Knox
Halvonik
Carson
Betz
Martin
Chalfant
Baker
Shaw
Galley
Holler
Hixenbaugh
Powell
Rebottini
Karolcik
Oldham
Allison
Sechrist
Bubnash
Hegyes
Masney
Johnson
Statzula
About half the names have been added so far, but I won't have time to finish adding them before I head back to Baltimore, and unless it's warm enough over Thanksgiving break, it will have to wait until spring.
The logos of the sponsor companies will be added off to the bottom right.
Saturday, October 2, 2010
Monday, September 6, 2010
Touch Ups
Subscribe to:
Posts (Atom)